These past few days I’ve been fixing my mistakes. When I did the framing in my basement, it was my first experience at doing that so I did it on a “I think this is right” basis. Well, when I completed my first room, I discovered that some parts I had done wrong… I’m about to instal ceramic tiling in the laundry room but before I start I have to fix one big mistake which was the framing for the door. I hadn’t enough 2×4’s for a proper door enclosure.

It’s all fixed now. So the next steps will be making some room in the other areas of the basement to temporarily relocate the washer, dryer and feezer in order to do the tiling. I’ll be putting the tiles directly on the cement floor. Tiles are cold anyway, subfloor or not, so might as well save a few hundred bucks by not putting a subfloor at all.

When I’ll start, I’ll try to have someone take a few pics.

Leave a Reply